This is the front door and the garage is to the left of the small tree with the sign on it.
This is the view from the lake side looking up the hill -
The framing crew started on the roof on Fri (1-9-09) and say the roof should be up in a week or so. We are picking out electrical fixtures and flooring so it is starting to come together!
WOW- it's really starting to come together!
ReplyDelete